IDS Énergie
Trois-Rivières · Based in the region
RBQ licence 8304-2689-07 · active in the registry on October 16, 2026 · electrical · issued by the CMEQ
Affiliations: CMEQ
Free basic listing · Is this your business?
The companies on this list are unverified partners: Écodici has not checked their file. Each one holds an active licence in the Régie du bâtiment du Québec registry as of October 16, 2026. Their listing is free and unsponsored: it is not a recommendation. Compare at least two written quotes.
In Mauricie, wind is what usually cuts the power. On November 3, 2019, two days after the Halloween storm, Hydro-Québec still counted 38,000 customers without power in Mauricie and Centre-du-Québec, the highest regional count in its update. The May 21, 2022 derecho then put Mauricie among the five hardest-hit regions, out of 554,649 customers affected across Quebec. It took 125 hours to restore 95% of them.
From Trois-Rivières to La Tuque, the region is served by Hydro-Québec, with no municipal utility. Rate Flex D is available, and since April 1, 2026, the Winter Credit Option no longer accepts new customers. A sample calculation: a 10 kWh battery drained during each of the 30 possible 4-hour events in a winter shifts 300 kWh at most. At a gap of about 37¢/kWh (46.463¢ at peak versus 9.103¢ off-peak), that is $112 per winter at best, before losses. Compare that with the quotes you get.
For work done since October 1, 2026 in a principal residence, Rénoclimat's grant reaches $4,000 for a fixed battery of at least 5 kWh, permanently connected to the panel, whose inverter delivers a true sine wave (1.2 kW continuous, 2.5 kW surge), works alongside the grid and meets Hydro-Québec standard E.12-07. The master electrician's fees are not covered by this measure, and no other public assistance can be combined for the same work. LogisVert offers nothing for storage.
Insist on a master electrician who belongs to the CMEQ and holds an RBQ subcategory 16 licence, and ask them to wait for Hydro-Québec's conditional approval before ordering equipment. Then see the home battery guide, how to check a contractor's licence and the home battery calculator, to redo this math with your own figures.
First the companies based in the region, then those that serve it from elsewhere, then those that serve all of Quebec, in alphabetical order.
Trois-Rivières · Based in the region
RBQ licence 8304-2689-07 · active in the registry on October 16, 2026 · electrical · issued by the CMEQ
Affiliations: CMEQ
Free basic listing · Is this your business?
La Tuque · Based in the region
RBQ licence 5787-9512-01 · active in the registry on October 16, 2026 · electrical · issued by the CMEQ
Affiliations: CMEQ
Free basic listing · Is this your business?
Shawinigan · Based in the region
RBQ licence 1173-4746-28 · active in the registry on October 16, 2026 · electrical · issued by the CMEQ
Affiliations: CMEQ
Free basic listing · Is this your business?
Saint-Boniface · Based in the region
RBQ licence 5848-8024-01 · active in the registry on October 16, 2026
Licence holder in the registry: 9511-5309 Québec inc.
No electrical subclass on this licence: ask which master electrician will do the hookup.
Affiliations: APCHQ
Free basic listing · Is this your business?
Trois-Rivières · Based in the region
RBQ licence 5795-7854-01 · active in the registry on October 16, 2026 · electrical · issued by the CMEQ
Affiliations: CMEQ
Free basic listing · Is this your business?
Also serves the region · based in Lac-Etchemin
RBQ licence 5652-3434-01 · active in the registry on October 16, 2026 · electrical · issued by the CMEQ
Affiliations: CMEQ
Free basic listing · Is this your business?
Serves all of Quebec · based in Alma
RBQ licence 5801-2592-01 · active in the registry on October 16, 2026
Licence holder in the registry: 9437-6076 Québec inc.
No electrical subclass on this licence: ask which master electrician will do the hookup.
Free basic listing · Is this your business?
Serves all of Quebec · based in Saint-Eustache
RBQ licence 5848-3199-01 · active in the registry on October 16, 2026
No electrical subclass on this licence: ask which master electrician will do the hookup.
Affiliations: ACQ, Victron Energy authorized installer, Volthium certified installer, Élios certified installer
Free basic listing · Is this your business?
Serves all of Quebec · based in Brome
RBQ licence 5662-4885-01 · active in the registry on October 16, 2026 · electrical · issued by the CMEQ
Licence holder in the registry: 8320764 Canada inc.
Affiliations: CCQ, CMEQ, NABCEP
Free basic listing · Is this your business?
Serves all of Quebec · based in Chute-Saint-Philippe
RBQ licence 5867-4896-01 · active in the registry on October 16, 2026 · electrical · issued by the CMEQ
Affiliations: CMEQ
Free basic listing · Is this your business?
Serves all of Quebec · based in Sainte-Angèle-de-Monnoir
RBQ licence 5706-2606-01 · active in the registry on October 16, 2026
Licence holder in the registry: 9309560 Canada Inc.
No electrical subclass on this licence: ask which master electrician will do the hookup.
Affiliations: APCHQ
Free basic listing · Is this your business?
Serves all of Quebec · based in Montréal
RBQ licence 5720-6765-01 · active in the registry on October 16, 2026 · electrical · issued by the CMEQ
Affiliations: APCHQ, CMEQ
Free basic listing · Is this your business?
Serves all of Quebec · based in Montréal
RBQ licence 5722-6755-01 · active in the registry on October 16, 2026
Licence holder in the registry: Solution Québec Solaire inc.
No electrical subclass on this licence: ask which master electrician will do the hookup.
Affiliations: Generac authorized installer, Enphase Storage certified installer, FranklinWH certified installer, Sol-Ark (Gold) certified installer
Free basic listing · Is this your business?
Serves all of Quebec · based in Terrebonne
RBQ licence 5856-5094-01 · active in the registry on October 16, 2026 · electrical · issued by the CMEQ
Affiliations: CMEQ
Free basic listing · Is this your business?
We looked for companies that advertise this service on their own website, then kept only those whose licence is active in the Régie du bâtiment du Québec open data. For heat pumps, the licence must also include a refrigeration subclass (15.9 or 15.10). When a subclass that Hydro-Québec requires for LogisVert is missing (15.1, 15.7 or 15.8 for a heat pump; 11.2 or 13.5, and 16, for solar panels), the listing says so. The service area is the one the company advertises. Nobody paid to be listed here, and no company has been rated: check the licence, insurance and references yourself before you sign. Check a contractor before you sign: RBQ licence, CMMTQ and CMEQ
Describe your project in a minute. We pass your request on to no more than three companies that serve your region; they contact you directly. It is free and there is no obligation.
Also in Mauricie: Heat pump installers · Solar panel installers
Other regions: Lower St. Lawrence · Saguenay–Lac-Saint-Jean · Capitale-Nationale · Eastern Townships · Montreal · Outaouais · Abitibi-Témiscamingue · Côte-Nord · Nord-du-Québec · Gaspé Peninsula–Magdalen Islands · Chaudière-Appalaches · Laval · Lanaudière · Laurentians · Montérégie · Centre-du-Québec
Text updated on October 16, 2026
Correct or remove your free listing, add your business, or become a verified partner to receive quote requests from your region directly. The Optimized plan adds a complete web page in your name, optimized for Google. See the plans · Example of an Optimized page